Which of the following command line environment is used for interacting with Git?
Which effort estimation method uses story points to estimate size?
In risk management, high-priority risks are
In one company, each development team performs analysis, design, and implementation, and testing is performed by a testing team. Such project organization is referred to as
The Capability Maturity Model Integration (CMMI) is a model for
A project that anticipates frequent change of requirements should use
A company defines its own agile development process in which anyone can change anything at anytime, and the management lets the projects evolve as naturally as they would. Which CMMI maturity level is the company at?
What is software configuration management (SCM)?
During the implementation phase, you discover that you need to change the architectural design of the software system. What should you do as required by software configuration management practice?
Change incorporation is a function of
Which of the following best characterizes a baseline?
Software configuration management is needed to
Which of the following command line environment is used for interacting with Git?
Which of the following web hosting services uses Git control system?
A software quality attribute
Inspection is
A metric value that is believed to have a significant implication is referred to as
According to Barry Boehm, verification is concerned with
Which of the following is correct?
Which metric measures “the relevance of the functions of a class to the core functionality of the class?”
A software process
What are the three tracks of software engineering life cycle activities?
Agile methods
A use case diagram models
A sequence diagram
In a requirements specification, constraints
A sequence diagram that models the software system to be implemented is referred to as