Manual process with 6 operators

Process Information

1. Cutting (the saw cuts tubes and rods for many FEI product families).  Manual process, 1 operator

 Cycle time = 15 seconds

 Changeover time = 15 minutes (length), 60 minutes (diameter)  Reliability = 100%

 Inventory

i. 20 days of uncut tubes

ii. 5 days of cut tubes.

2. Welding workstation 1 (dedicated to the hydraulic control sections product family)

 Welds the first machined casting to the tube

 Automatic process, with operator load and unload external to the

machine cycle

 Cycle time:

i. Operator = 10 seconds

ii. Machine = 30 seconds

 Changeover time = 15 minutes (length), 60 minutes (diameter)

 Reliability = 90%

 Inventory = 3 days of welded sections.

3. Welding workstation 2 (dedicated to the hydraulic control sections product family)

 welds the second machined casting to the tube

 Automatic process, with operator load and unload external to the

machine cycle

 Cycle time:

i. Operator = 10 seconds

ii. Machine = 30 seconds

 Changeover time = 15 minutes (length), 60 minutes (diameter)

 Reliability = 80%

 Inventory = 3 days of welded sections.

4. Deflash workstation (dedicated to the hydraulic control sections product family)

 Automatic process, with operator load and unload external to the machine cycle

 Cycle time:

i. Operator = 10 seconds

ii. Machine = 30 seconds

 Changeover time = 15 minutes (length), 60 minutes (diameter)

 Reliability = 100%

 Inventory = 5 days of deflashed sections.

5. Painting (hydraulic control sections are shipped to an outside contractor for painting)

 Painting lead time = 2 days

 One daily truck pickup of unpainted sections and drop-off of painted

sections

 Observed inventory:

i. 2 days at the painter

ii. 6 days of painted sections at FEI.

6. Connector assembly (dedicated to the hydraulic control sections product family)

 Manual process with 6 operators

 Total Work Time per Piece = 195 seconds

 Changeover time = 10 minutes fixture swap

 Reliability = 100%

 Observed finished goods inventory in warehouse = 4 days of finished

hydraulic control sections.

7. Machining of Castings (dedicated to the hydraulic control sections product family)

 Automatic machining process with one machine attendant  Cycle time = 30 seconds

 Changeover time = 2 hours

 Reliability = 100%

 Observed inventory:

i. 20 days of raw castings from the supplier

ii. 4 days of machined castings.

8. Despatch department

 Removes parts from finished goods warehouse and stages them for truck shipment to customers.

LOOKING FOR THIS ASSIGNMENT OR A SIMILAR ONE? WE HAVE HAD A GOOD SUCCESS RATE ON THIS PAPER! ORDER WITH US TODAY FOR QUALITY WORK AND GET A DISCOUNT!

ORDER NOW

Disclaimer:

All types of paper that Discount Writers provides is only for the purpose of assistance! No text, paper, assignment, discussion would be similar with another student therefore guaranteeing Uniqueness and can be used with proper references only!

More tools: Better Grades: Choose your Homework Help:

Assignment Help: We would write your papers according to the instructions provided and guarantee you timely work

 

Entire Online Class Help: We are here for you and we would do your entire Class work from discussions, assignments, Replies, Exams and Quizzes at a Cost

 

Exam/ Quiz Help: We have a team of writers who specialize on exams from any specific field and we would give you an A+ Grade!

 

ORDER NOW